
Claudia's OM
(Click on pictures for a larger view)





Building Process ...
body outline
body mold completed
side bending form completed
sides, back, top joined, thicknessed and rough sized
sides bent and fitted into mold
gluing the scarf joint
gluing the heel block
completed neck blank
gluing the headstock veneer
headblock, tailblock installed
headstock cut out
soundhole rosette completed
carving the heel
heel carved
gluing the bridge plate
gluing the finger braces
gluing the soundhole braces
gluing the upper transversal graft
gluing the upper face brace
gluing the second lower face brace
gluing the second x-brace
sculpting the braces
soundboard bracing completed
gluing first back brace
back bracing completed
gluing top linings
top glued to sides
gluing back linings
fitting the back
back installed
end graft completed
first of the bindings applied
bindings completed
fingerboard ready for inlaying
peace dove inlay cut out (not inlaid yet !)
logo inlaid in headstock
gluing the fingerboard
fretting completed
peace dove inlay
carving the neck
neck carving completed
finish applied and hung up to cure